Skip to main content

Demo example — for example purposes only

All facilities, locations, results, and program information shown here are fictional.

← All facilities

School A

Public school · Demo location

Exceedance — mitigation in progressRound 2 (2026-27)
2026-01-1
Most recent test date
55
Outlets in sampling plan
2
Outlets ≥ 10 ppb
1958
Building constructed

Plain-language summary

2 of 12 tested outlets were at or above the 10 ppb action level. Each of those outlets was taken out of service immediately, a short-term control was put in place, and a permanent fix was scheduled. Mitigation is in progress and post-mitigation retests will be published here.

Results by outlet location

Lead in ppb compared to the 10 ppb action level

Sample IDOutlet locationFixtureSample typeLead (ppb)Mitigation takenPost-mitigation retest
F_KS_1-001Main Building · Room 100Drinking fountainFirst draw8 h stagnation12≥ 10 ppbFixture removed from service + baggedScheduled
F_KS_1-002Main Building · Room 103Classroom sinkFirst draw9 h stagnation19≥ 10 ppbFilter installed (NSF 53)Scheduled
F_KS_1-003Main Building · Room 106Kitchen faucetFirst draw10 h stagnation4——
F_KS_1-004Main Building · Room 109Bottle fillerFirst draw11 h stagnation1.5——
F_KS_1-005Main Building · Room 112Nurse's office sinkFlush12 h stagnation3.5——
F_KS_1-006Main Building · Room 115Drinking fountainFirst draw13 h stagnation1——
F_KS_1-007Annex · Room 118Classroom sinkFirst draw14 h stagnation3——
F_KS_1-008Annex · Room 121Kitchen faucetFirst draw15 h stagnation< 1.0——
F_KS_1-009Annex · Room 124Bottle fillerFirst draw16 h stagnation2.5——
F_KS_1-010Annex · Room 127Nurse's office sinkFlush17 h stagnation< 1.0——
F_KS_1-011Annex · Room 130Drinking fountainFirst draw8 h stagnation2——
F_KS_1-012Annex · Room 133Classroom sinkFirst draw9 h stagnation4——

Published by Lead-Safe Kansas. Facility-level data only — no student, family or staff personal information is collected or published.